Features
● It is forged by special alloy steel with high intensity and high toughness, and then it is heat treated;
● It can be matched with sling and G80 chains which can meet the standard EN818-2;
● Each workpiece should pass testing at 2.5 times of working load limit;
● We should carry out sampling and 20000 times of fatigue testing;
● We should carry out strict sampling and breakage testing for each batch of products;
● We should carry out 100% magnetic powder flaw detection;
● 100% of the pin should be tested to ensure that they have the same hardness;
● Surface treatment: plastics spraying.
● Color code: red RAL3020/yellow RAL1003.
Item No. | Weight/kg | Working Load Limit/t | Breaking Load/t | A±1 | B±1 | C±1 | E±1.5 | M±2 | N±1 | L±3 | ф±2 |
SLR861-6-8 | 0.475 | 1.12 | 4.48 | 8 | 40 | 29 | 20 | 66 | 11 | 136.5 | 17 |
SLR861-7/8-8 | 0.885 | 2 | 8 | 9.5 | 45 | 33.5 | 27 | 84 | 13 | 172.5 | 27 |
SLR861-10-8 | 1.73 | 3.15 | 12.6 | 12 | 56.5 | 42 | 33 | 103 | 11.5 | 215 | 34 |
SLR861-13-8 | 3.39 | 5.3 | 21.2 | 15 | 75 | 57.4 | 40 | 133.3 | 20 | 258 | 45 |
SLR861-16-8 | 5.57 | 8 | 32 | 18.5 | 82 | 72 | 44 | 156.7 | 26.5 | 305 | 305 |